Front-End
16.08.2018 Release Notes (v2.01.42)
- The 'External task' with 'completed' status is displayed as 'not completed'.
- Workload incorrect display.
13.08.2018 Release Notes (internal v2.01.41)
- Support move of "SNET" tasks when project start date changes (still need some backend changes).
- [Import Template] Support the correct display of the project after importing Template and saving.
02.08.2018 Release Notes (internal v2.01.39)
- Duplicated resources after import from MSP.
- Export to PDF does not work in the French and German environments (accentuated characters).
- Missing some JSON data on restapi/plan/data POST request.
- Change tag <title>.
- Error Dialog - expand Description section by default.
- Restrictions with Zooming.
- Force IE to use versions 9 and 10.
- The imported project is opened in the app and has the active 'Save'/ 'Cancel' buttons.
- Total project duration is not shown correctly.
- Invalid workload data with Unavalabilities.
- Gap in the timeline of the workload chart.
14.06.2018 Release Notes (v2.01.26)
- 'onLoad' event field rename.
- Disable edit "Freeze" property for external entity.
- Reopen of the drop-down does not work.
- Multi-projects Gantt issue: 2 project - external links to the same entity.
- Multi-projects Gantt can be exported to MSP, but then the project names are missing.
- Import from MS Project to Genius Project can result in invalid data.
08.06.2018 (internal v2.01.25)
- A new resource does not appear in the Workload list after action Add resource to project.
- Cannot load project with the onLoad event = SUCCESS.
- Multi-projects Gantt: the display of the critical path is not hidden after changing some data.
- [E11] The tasks names are not displayed on Warning dialogs.
06.06.2018 Release Notes (v2.01.24)
- Gantt cannot load if the "project-lock" post request returns status 500.
- The title of 'Cancel' button does not fit in the area in the German version.
- [IE11] The arrow on Drop-downs is shifted.
- [IE11] The style is broken in the"Details" card.
05.06.2018 Release Notes (internal v2.01.23)
- Hide the "Export to MS Project" icon in the Action bar in Multi-projects Gantt.
- Change the label of the button to create external links (from -> to).
04.06.2018 Release Notes (internal v2.01.22)
- Support translations.
- Gantt Export to MS Project does not always work.
- External Links color scheme.
- External link target is not updated automatically when source changes.
- Indent warning - multiple cases.
- "Print" icon replaced with "Export to PDF" icon.
25.05.2018 Release Notes (v2.01.21)
- Print: "Zoom all" is not applied the Gantt part.
- Display "Print" icon & "Import template" icons.
In Read mode:
In Edit mode: - Disable Deleting Phase when it contains Genius Project documents not coming from the Gantt.
- Workload section: workload of a given resource is displayed differently in the different projects.
- Deliverable: display task-related information as disabled on details window.
- Project onLoad event notification.
- Delete [Not Assigned] should not be possible. The resource should not be displayed.
14.05.2018 Release Notes (v2.01.20)
- Print function improvements.
- Project onSave event notification.
- Search dialog. A close icon is located wrongly.
- Global Gantt. Missing "View" icons section title.
- Global Gantt. Missing "Search" icon.
- Warning dialogs styling.
- Indent dialog warning text.
- Print: the PDF document was not created if a user did select "Current" dates for displaying.
10.05.2018 Release Notes (v2.01.15)
- Error Dialog corrections and improvements.
- Scroll bar functionality in Internet Explorer.
- Selection window does not open on first click.
- Unification of the dropdowns -> Make all same style as the baseline dropdown.
- Gantt table drop-down menus: the arrow icon is displayed when a user activates a menu.
- Hide the cursor pointer when a user hovers over unclickable items in drop-down menu.
- Resources drop-down in Workload: the arrow icon is not always displayed.
- Allow an external link with an actual load to be deleted from the current plan.
- Drop-down menus: the click on an arrow icon does not activate the menu.
- The duration of project and the phases duration are not changed on project initialization when the external task start or end date is changed in the linked project.
- Phase having a single sub-project: duration is not valid.
- The click on the "arrow" icon of the drop-down does not work on "Insert sub-project" & "Insert link from ..." pop-ups.
- Plan - Import Template action implementation.
- The name of the "Import Template" button and the name of the pop-up should match.
- Multi-projects Gantt: Alt+T hotkeys calls 'Import Template' popup should be opened when Nothing or Root node is selected.
20.04.2018 Release Notes (v2.01.14)
- Duration is changed for task which has "As soon as possible" parameter and "Start Day" no matched with "Expected Launch Date".
- Description field for Milestone.
- Update Constraint Date for all task with Constrain Type = ASAP on project initiation when Expected Launch Date is changed.
- Investigate if it is possible to add Close button.
- [Global-Gant] - Open Projects Gantt button does not work.
- Rename button in [Global-Gant] - Open Projects Gantt.
- [Global-Gant] - Sections Vertical delimiter - collapse/expand buttons same as for Project Gantt.
- [Global Gantt] report issue dialog.
30.03.2018 Release Notes (v.2.01.13)
- Improvement: Selection after Copy/paste of Phases.
- Rename "Milestone" to "Deliverable".
- Dialog corners.
- Double-clicking on non-editable columns.
- Items Properties dialog.
- [Multi-projects Gantt] Improvement: All projects of the resource are not displayed in Workload block.
- [Multi-projects-Gantt] Show Workload block in Multi-projects Gantt.
- Gantt chart does not consider first day of the week and week-ends.
23.03.2018 Release Notes (v.2.01.12)
- Collapse button does not work as expected.
- Improvement: [Global Gant] The values in the last column are displayed not fully.
- Improvement: The arrows for changing of Table Gant size are displayed on "Baseline" menu.
- Phase in multi-projects Gantt - strange behavior.
- "Insert link from external project" dialog.
- Improvement: Remaining Load is not displayed for a resource.
- [Milestone] The text next to a Milestone is displayed at a distance from the icon.
- Allow to do Timeshift by Drag &Drop for several tasks in Gantt block.
- Import from MSP XML does work now.
- Better manage resources no longer in the Participants.
- Add a notification when unable to import plan data.
15.03.2018 Release Notes (v.2.01.11)
- Improvement:[Baseline] Baseline should be displayed fully even if its dates are earlier or later than the project dates.
- Insert sub-project does not work if an entry is focused.
- Insert link from external link does not work in v. 2.01.9.
- Do not sum Planned load of cancelled tasks in the phases.
- Add the German translation.
- 3 digits in Item properties - resources - planned load.
- Cannot copy to clipboard the field Information from the "Report an issue" dialog.
- Context menu - remove extra menu delimiter.
- The system sends GET request on workload when user saves or unsaved data.
- [Project Gantt/Multi-projects-Gantt] not needed 'restapi/resource/undefined/workload' GET request while sending 'data' POST request.
- Add the restriction for the'Scale gantt width to... pages' field.
- Add the dot symbol at the end of the Lock warning message in the [Project Gantt/Multi-projects-Gantt] modules.
- [Multi-projects-Gantt] Add the displaying the Browser Alert with Warning when a user leaves a page without saving.
- Improvement: [Multi-projects-Gantt] "Insert" task should create a new task immediately below selected project (even if the project is collapsed).
- Improvement: [Multi-projects-Gantt] The "outdent" icon is active although such activity is not available.
- [Multi-projects-Gantt] Phase outdent does not work properly.
01.03.2018 Release Notes (v.2.01.08)
- [Multi-projects-Gantt] project locks - warning message (important for 1st release).
- [Multi-projects-Gantt] Show error when user tries to link entities from different projects.
- [Multi-projects-Gantt] - disable creating entities when the 'exclude' parameter is presented (important for 1-st release).
- Improvement: [project locks] [Edge/IE11] the name of the locked project is not displayed on the warning message pop-up.
21.02.2018 Release Notes (v.2.01.07)
- [Multi-projects-Gantt] Support adding new task.
- [Multi-projects-Gantt] Allow to Cory/Paste tasks.
- [Multi-projects-Gantt] Support Auto-linking on Inserting tasks.
- [Multi-projects-Gantt] Support Edit and Delete Resources.
- [Multi-projects-Gantt] Support baseline saving.
- [Multi-projects-Gantt] Allow to Add Resource in all projects.
- [Multi-projects-Gantt] Do request POST /restapi/lock in [editLockPingDelay] seconds.
- [Multi-projects-Gantt] Support replace resources.
- [Multi-projects-Gantt] Improvement: Phase inside Project can do "outdent" and it can become a project.
12.02.2018 Release Notes (v.2.01.05)
- Workloads for tasks are showed incorrectly.
- Improvement: The values to be printed in "Priority" column differ for the same object.
- [Multi-projects-Gantt] Support adding new task.
- Improve adding versions for frontend.
Back-End
13.08.2018 Release Notes (v2.01.9)
- Provide resources from a current project for an imported plan.
- Invalid display of special French and German accentuated characters after import.
02.08.2018 Release Notes (v2.01.8)
- Invalid workload data with Unavalabilities.
- Total project duration is not shown correctly.
- Missing some JSON data on restapi/plan/data POST request.
14.06.2018 Release Notes (v2.01.7)
- Import plan: "Import plan" language specific keyword.
- "Actual" fields in Task must hold correct number of values upon creation.
- Migration Agent: external links updater.
- Migration Agent: invalid dates default value updater.
- Deliverable Deadline calculation is not working.
- Project Lock - case if a user has no edit access or has Author access.
- Migration Agent: external entities updater.
- Support Project onLoad event notification.
- Migration Agent: sub-projects updater.
04.06.2018 Release Notes (v2.01.6)
- Phase is removed with the case "only external links".
- Migration - Fix Constraints in Copied Projects.
10.05.2018 Release Notes (v2.01.5 b13a639)
- Remove Filter option from multi-projects Gantt.
- Planned/Actual dates not kept after planner synchronization (project date locks are not working).
- RemainingWork and RemWork fields in Task must always be created.
- In tasks, fields containing values for each assignment must have the correct number of values.
03.04.2018 Release Notes (v2.01.5 462ee85)
- Support flexible first day of the week and week-ends.
- Support unlocking of a lock in [Project Gantt/Multi-projects Gantt].
- New assignments cannot be opened.
- Disable change reservation status from "In progress" to "Requested" if it has an actual start date.
23.03.2018 Release Notes
- Improvement: Initialization of deliverable workflows not working.
- Disable change reservation status from "In progress" to "Requested" if it has an actual start date.
- The planner is trying to load sub-project data that does not exist any more.
- Do not remove Phase if it has hidden child entries.
- [Not assigned] assignments issue.
16.03.2018 Release Notes
- The Assigned person in the Gantt must be put both in the Author and AssignedTo field.
- BLI #6966 Some data is no longer updated when synchronizing a Gantt - Assignment UpdateCashFlowData.
- Default assigned task status not as expected.
- BLI #5981 While HTML Planner is open in edit mode timesheet inputs will be lost after saving the Gantt - Disable Actual data update.
- Exclude Completed and Cancelled projects from the workload chart.
- Improvement: Investigate why not all projects are shown in Table.
- Milestone Name Assignments Fixes.
26.02.2018 Release Notes
- Backend: support "Add-new-column-text-column" - 200 symbols text item.
- Milestone Workflow - multiple assignments are removed after saving.
- [Multi-projects-Gantt] Projects Lock.
- [Multi-projects-Gantt] add filter option "exclude tasks and milestones".
- [Multi-projects-Gantt] Gantt Edit.
- Issue with shifting dates on servers with different time zones.
- Import Plan - ignore Genius Project XML data.
- BLI #6989. Old versions of deliverables appear in the views.
- BLI #6941. [Multi-projects Gantt] dialog changes.
- BLI #6944. Task with actual load can be deleted - assignments are still deleting.
- BLI #5981. While HTML Planner is open in edit mode timesheet inputs will be lost after saving the Gantt - do not update actual dates, actual load, status Completed.
- Test a workload issue with a task date range more than 1 year.
- [Multi-projects Gantt] - support external links.
- BLI #6966 - project workload.